We are making awesome progress on a variety of projects headed towards a November splash 🤞. Before we left Peñasco for our summer road trip I removed, washed and dried all our running rigging. Now I’m inspecting and tweaking each line. Our main halyard needed to be lock stitched, and re-whipped at both ends as the old whipping came apart with the scratch of a fingernail. Now it’s ready for use.


